Sorry, you need to enable JavaScript to visit this website.
Time to read
less than
1 minute
Read so far

Final fix up from March flooding

Posted in:

The bridge on the Bow Valley Expressway is the only project left to be fixed after the floods of last March. The water washed away the approaches on both sides of the bridge, as shown in this photo from last March. County Commissioners will take bids on the project at their Feb. 11 meeting. Several Cedar County roads ended up with huge holes in them after the flood waters receeded.